Financial management glossary
Contents |
[edit] Working capital
- Working capital is the everyday working money available to run the business.
- Current assets - current liabilities = working capital.
- The amount of working capital required can be reduced by accelerating the rate at which money circulates through the business (for example prompt billing).
For more information see: Working capital
[edit] Working capital turnover rate
- Total annual fee income / average value working capital = working capital turnover rate.
[edit] Profit and loss account
- Annual statement of income and expenditure that shows if a company has made an overall gain on trading performance.
For more information see:Profit and loss account
[edit] Balance sheet
- A picture of the business as it stands, providing a statement of total assets and liabilities at a given point in time (usually the year end).
For more information see: Balance sheet
[edit] Monthly 'flash' profit & loss report
Actual vs budget information based on:
- Net Income (after paying others) (work in progress not included).
- Resources.
- Overheads.
- Gives an indication which area might be responsible for a loss or profit.
- Useful over a longer period of time to spot trends and blips.
[edit] Key performance indicators (KPI's)
Liquidity KPI's (liquid assets=cash):
- Analyses ability to pay bills as they become due.
- Current ratio = current assets (including work in progress) / current liabilities.
- Quick ratio (acid test) - quick assets (cash+bank balance+debts) / current liabilities'
- Ratios over 1 are deemed satisfactory. The higher the better.
Financial Performance plan:
For more information see: Key performance indicators
[edit] Project resource plan
- Shows hours of each grade of person required monthly.
- Hours translated into cost x by rate per hour of each grade.
- Projected fees vs projected cost - plotted on graph.
- Compare projected with actual to monitor performance.
- Share information to give a sense of involvement and responsibility. This will allow them to align their actions with the best interests of the company.
[edit] Fee forecasting
Fee forecasting is crucial to running a business as it allows the future financial position to be assessed and ensures that records of potential fees are maintained.
Captive fee forecasting:
- Fees are agreed, fully documented, contractually binding and scheduled for current projects.
- An indicator of how busy a company is likely to be in short to medium term.
- Avoid the cliff edge - when a project is delivered fees reduce so it is important to win more work to maintain cash-flow through fees.
Future possible fee forecasting:
- All possible fees hoped to be earned. Anything but certain.
- Quantify probability of winning them with a success probability factor %.
- The aim is to attempt to predict the medium to long term.
Resources forecast:
- Establish whether the right number of people are available to deliver the work lined up in the captive fees forecast.
- Keep a rolling weekly forecast of people required vs people available.
- Plan for flexibility so there is always some resource available for general work.
- It is most efficient to use those with recent experience on similar projects to achieve good results quickly.
For more information see: Fee forecasting.
[edit] Cashflow forecasting
- Cashflow = total money in and out of a business affecting liquidity.
- The most accurate way of predicting the financial health of a company in the short - medium term.
- Gives an idea of when cash shortage problems may be approaching.
- Rolling 6 monthly.
- If seeking a loan / overdraft, a 2/3 year forecast may be needed.
[edit] Credit Control
- Good organisation is the key to good credit control.
- Invoice for fees in a regular and determined way.
- Chase up when they are not paid on time.
- Agree payment terms.
- Keep a record of all correspondence regarding fees.
- Logged in aged debtor report - all outstanding payments and for how long.
- Understand clients payment systems.
- Outstanding invoices should be chased
- Remind them of agreed terms in invoices.
- If over due send reminder email with copy of invoice.
- Further 1 or 2 weeks… phone call.
- Last resort: Dispute resolution.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.